Grid Connection of Generation Facilities

In the reporting period, there were 98 contracts for grid connection of power generation facilities for a total requested maximum capacity (excluding previously connected capacity) of 249.22 MW with a total value of RUB 1,046.94 million, excluding VAT (including 68 contracts for microgeneration facilities). A total of 67 contracts for grid connection of generation facilities were discharged (for 108.64 MW at a cost of RUB 325.39 million), including 53 contracts for microgeneration facilities.